Its not clear how the 30% plan came to be, but sometime in the past several years a group of (not yet identified) people decided building a smaller footprint reservoir with walls well over 30 feet above the ground would be better than the original larger footprint reservoir with much a lower berm. Some presume this is seen as a cost saving measure.But the community members nearby were not consulted.